Well they're back and they are making good (aka finishing the fire and stuff they said/should have done). One of the things is a small bit of plaster work above the boiler. I could do it, but I am crap at plastering, and it's in a "difficult" place, and it's their job because "making good" was in the price...
And they're doing the plastering (hurray), but I go in the kitchen and... (you've probably guessed it)... he's decided to use the kitchen sink for plaster mixing!!!!????!!!!! That'd be the kitchen sink that used to have clean breakfast things drying on it. But what really gets me is that the boiler's in the "utility" room which has it's own scruffy/well used/metal sink. It's right next to the bloomin' boiler. He doesn't even have to move to use it...
Aghhhhhhhhhhhhhh (again)
